Understanding Structural Frames Category in Shedmate
Learn how the master template quantifies Structural Frames for quoting and B.O.M purposes, including (UB, UC, L, TH, Z, C, Purling and Girt bridging, RHS, SHS, etc).
Creating and Managing Structural Frames in Shedmate
1. Review Structural Frame Items 0:20
-
Access the list of structural frame items in Shedmate.
-
Delete any items that do not apply to your business (e.g., if your company only uses Zs or top hats).
2. Select and Delete Unused Items 0:34
-
Use the Shift key to select multiple items at once for deletion.
-
Ensure that only relevant items remain in your list.
3. Check Company-Specific Settings 1:08
-
Verify the company settings to see which profiles are enabled for your business.
-
4. Update Company Rules 1:22
- Contat support@shedmate.com.au to update your company settings to include the preferred structural frame profiles.
-
This will ensure that the correct profiles are available in the designer.
5. Expore Purlin and Girt Bridging and Other Structural Frame Profiles 2:22
-
Navigate to the structure section and scroll down to find Purlin and Girt bridging.
- For Bracing, Request any additional lengths or profiles from the support team if necessary.
7. Select Commercially Available Frames 4:06
-
Review the list of frames and delete any that are not commercially available in your region.
8. Update Pricing Database 4:17
-
Ensure that all items in the design have corresponding pricing.
-
Modify any items that do not have pricing to suit your available materials.
9. Use Folded Channels for Openings 4:43
-
Shedmate utilizes folded channels when designing openings, but you can edit the pricing calculations to assign a C frame to it, for example.
-
Folded channels adjust it size automatically based on the wall girt profile dimensions.
10. Manage PFC Frames 5:39
-
Use PFCs for bridging or supporting beams as needed in your project.
11. Select Bracing Options 6:14
-
Choose from various bracing options available based on your company settings.
12. Review Pricing Calculations 6:57
-
Open the pricing calculation for structural frames to ensure accurate quantification.
Cautionary Notes
-
Always verify that the items you are deleting are not required for current or future projects.
-
Ensure that your pricing database is up-to-date to avoid discrepancies in quotes.