---
title: 17/11/2026 - Drawing sets, Instant Ordering, CAD exports and more
description: "ShedMate's November 2026 release notes: complete drawing sets, Instant Ordering, CAD exports, engineering for more sheds, and everything released since May."
---

[Skip to content](https://help.shedmate.com.au/knowledge/november-2026-release-notes#main-content)

English

Show submenu for translations

![](https://help.shedmate.com.au/hs-fs/hubfs/shedmate-logo.png?width=100&height=75&name=shedmate-logo.png)

- [All topics](https://help.shedmate.com.au/knowledge)
- [Costing course](https://help.shedmate.com.au/knowledge/setting-up-shedmate-costing-course)
- [Release notes](https://help.shedmate.com.au/knowledge/release-notes)
- [FAQ](https://help.shedmate.com.au/knowledge/frequent-asked-questions-faq)

Open main navigation

Close main navigation

- [All topics](https://help.shedmate.com.au/knowledge)
- [Costing course](https://help.shedmate.com.au/knowledge/setting-up-shedmate-costing-course)
- [Release notes](https://help.shedmate.com.au/knowledge/release-notes)
- [FAQ](https://help.shedmate.com.au/knowledge/frequent-asked-questions-faq)
- English
  
  Show submenu for translations
- [Contact support](mailto:support@shedmate.com.au)

[Contact support](mailto:support@shedmate.com.au)

 How can we help you?

- There are no suggestions because the search field is empty.

1. [Help Center](https://help.shedmate.com.au/knowledge?hsLang=en)
2. [Release Notes](https://help.shedmate.com.au/knowledge/release-notes?hsLang=en)

# 17/11/2026 - Drawing sets, Instant Ordering, CAD exports and more

## Complete drawing sets with your branding, supplier orders straight from your quote, cladding and flashing drawings, CAD exports and engineering for more sheds, plus everything we've released since our May note.

### Welcome to ShedMate's November release notes

**This update will be live by Monday 7 December.**

It's one of the biggest ShedMate updates yet, built to save your team time from design to quote to order: complete drawing sets with your own branding, cladding and flashing drawings, CAD exports, supplier orders straight from your quote, and engineering for more of the sheds you sell.

In May we said a Bracket System update and an ordering update were on the way. Both are in this note, along with a round-up of the improvements we've released since then, so everything is in one place. At the end you'll find a few checks worth doing before your next quote.

---

### What's New

**In this update:**

- **Complete drawing sets in a few clicks.** The Sheet Manager builds a full drawing set from your shed design.
- **Supplier orders straight from your quote.** Instant Ordering builds your orders from the shed you quoted.
- **Every version of a quote, kept.** Save, check and restore quote revisions.
- **Engineering for more of your sheds.** Mezzanine engineering, earlier warnings and set-up from the site address.
- **Footings that match how you build.** Choose which footing types your company offers.
- **Cladding and flashing drawings, and CAD exports.** DWG and DXF as well as PDF.
- **More of your connections, ready to build.** New brackets and a clearer Connection Types dialog.
- **Your brand on every sheet.** Your titleblock, logos and watermarks on every sheet.
- **New settings, more accurate quantities, and fixes you asked for.**

**Rolling out first, company by company:**

- **Instant Build (pilot).** Share the drawings and the 3D model with your builder in one link.
- **Quote, contract and supplier documents you design.** Switched on company by company.

**What we're working on:** a new Site Designer, still a work in progress.

**Also in this note:** improvements released since our May note, including smarter bridging, wall by wall cladding, General Assembly plans and faster pricing in Instant Quoting.

---

### 01 Complete drawing sets in a few clicks

The new Sheet Manager builds a full, consistent drawing set from your shed design, so nothing needs redrawing.

![Export plans with a preset plan package and its sheet list](https://help.shedmate.com.au/hs-fs/hubfs/01a-export-plans__2026-11-13.png?width=560&name=01a-export-plans__2026-11-13.png)

- Plans, elevations, details and schedules are laid out on numbered sheets, ready to print or send. Sheets renumber themselves when you add or remove one.
- Sheet packages group the sets you send out, such as a quote set, a council set or a factory set, and sheet sets remember which sheets to export.
- Your company starts with a streamlined set of ready-made drawing sets, set up and maintained by our team, so everyone exports the same approved set. Want a set changed? Ask our Customer Success team. Advanced users can ask to have Sheet Manager editing switched on.
- Package version history lets you check an earlier set-up, and each sheet is drawn when it's needed, so sets load faster.
- Export from the Shed Designer, or from the Bracket System.

**Clearer drawings**

![A cladding layout plan sheet with grid, tags and dimensions](https://help.shedmate.com.au/hs-fs/hubfs/01b-plan-sheet-cladding__2026-11-13.png?width=560&name=01b-plan-sheet-cladding__2026-11-13.png)

- Concrete and footing details (base details, anchor bolts, footing centres, slab levels and door rebates), and elevations where doors and windows hide the framing behind them.
- Repeated bays are drawn once and marked as repeated, so large sheds stay readable. Schedules fit the sheet and run onto the next one, and tags and labels no longer overlap.

**Good to know:** customising sheets now starts from a saved preset, which keeps your company's standards in place. Pick or create a preset first, then change the sheets.

**Read more:** [Build a drawing set with the Sheet Manager](https://help.shedmate.com.au/knowledge/build-a-drawing-set-with-the-sheet-manager?hsLang=en)

---

### 02 Supplier orders straight from your quote

Instant Ordering builds your orders from the same shed you quoted, so nothing is keyed in twice. It's new in this update, and a major upgrade to how you order.

![Instant Ordering split into supplier views](https://help.shedmate.com.au/hs-fs/hubfs/02-instant-ordering__2026-11-13.png?width=560&name=02-instant-ordering__2026-11-13.png)

- The order comes from the converted shed (brackets, frames and stock items) and is split into your supplier views, which you can copy across from Instant Quoting.
- Virtual items add the screws, bolts, seals and the like that aren't drawn on the shed, by rule, so they're counted in both your quotes and your orders.
- Missing Items shows anything no supplier view covers, so nothing slips through, and each saved order is kept as a version you can go back to.
- Instant Ordering is the first part of ShedMate redesigned for phones and tablets.

**Read more:**

- [Getting started with Instant Ordering](https://help.shedmate.com.au/knowledge/ordering-materials?hsLang=en)
- [Set up your supplier views for ordering](https://help.shedmate.com.au/knowledge/set-up-your-supplier-views?hsLang=en)
- [What are virtual items, and how do I set one up?](https://help.shedmate.com.au/knowledge/how-virtual-items-work?hsLang=en)
- [Check your order against the model before you send it](https://help.shedmate.com.au/knowledge/check-your-order-against-the-model?hsLang=en)
- [Export a purchase order to send to your supplier](https://help.shedmate.com.au/knowledge/export-a-purchase-order?hsLang=en)

---

### 03 Every version of a quote, kept

Quote revisions save each quote exactly as it was, so you can check or restore any version.

![A saved quote revision comparing frozen and current prices](https://help.shedmate.com.au/hs-fs/hubfs/04-quote-revisions__2026-11-13.png?width=560&name=04-quote-revisions__2026-11-13.png)

- Save a revision when you generate your documents. Each revision keeps the documents, prices and shed exactly as they were at the time.
- Open any past revision to check it, or restore it. ShedMate re-prices a restored revision to match its saved price as closely as it can. If designs or rules have changed since, small differences can show.

**Read more:** [Save and restore quote revisions](https://help.shedmate.com.au/knowledge/save-and-restore-quote-revisions?hsLang=en)

---

### 04 Engineering for more of your sheds

More sheds can be engineered without custom engineering, including mezzanines and difficult sites.

![The Engineering panel in the Shed Designer, with a mezzanine and its footings](https://help.shedmate.com.au/hs-fs/hubfs/05-engineering-mezzanine__2026-11-17.png?width=560&name=05-engineering-mezzanine__2026-11-17.png)

![The Engineering panel in the Shed Designer, showing three column base options and the price difference for each](https://help.shedmate.com.au/hs-fs/hubfs/05-engineering-options__2026-11-17.png?width=560&height=532&name=05-engineering-options__2026-11-17.png)

- Mezzanine engineering: choose the floor load, and footings are sized to suit. Double rows of supports are handled, and if an option won't work, ShedMate explains why.
- Earlier warnings, such as when footings are set to align with the slab before you request engineering.
- Updated capacity checks for square and rectangular hollow sections (SHS and RHS) to the Australian steel standard, and updated knee and apex brace tables.
- Set up engineering from the site address: wind region, terrain category, building class and council are worked out for you, and you can edit any of them.

**Good to know:** engineering is still reviewed and certified by our engineering team, as it is today.

**Read more:**

- [What do I get with ShedMate engineering, and what's covered?](https://help.shedmate.com.au/knowledge/what-do-i-get-with-shedmate-engineering?hsLang=en)
- [Why did engineering change the member sizes on my shed?](https://help.shedmate.com.au/knowledge/why-did-engineering-change-the-member-sizes-on-my-shed?hsLang=en)

---

### 05 Footings that match how you build

Footing Options keeps your quotes to the footing and soil types your company actually uses.

![Footing Options: footing types and soil types your company offers](https://help.shedmate.com.au/hs-fs/hubfs/06-footing-options__2026-11-13.png?width=560&name=06-footing-options__2026-11-13.png)

- Company admins choose which footing types from our standard range your company offers, rather than the whole library, along with your soil types, the defaults, and whether your team can change them per shed. You'll find it under **Settings › Footing Options**.
- Engineering then suggests footing sizes to suit each site, within the options you've chosen.
- Footing changes on an engineered shed can be kept or reset when engineering is applied, and they're colour-coded by the footing check.

**Read more:**

- [Does ShedMate engineering cover my slab, footings and soil test?](https://help.shedmate.com.au/knowledge/does-shedmate-engineering-cover-my-slab-footings-and-soil-test?hsLang=en)
- [Set up your Footing Options](https://help.shedmate.com.au/knowledge/set-up-your-footing-options?hsLang=en)

---

### 06 Cladding and flashing drawings, and CAD exports

Cladding layouts and flashing profiles are now part of your drawing set, and the whole set exports to CAD.

![A flashing sheet from the new drawing set](https://help.shedmate.com.au/hs-fs/hubfs/08-flashing-sheet__2026-11-17.png?width=560&height=396&name=08-flashing-sheet__2026-11-17.png)

- Cladding layout drawings show wall and roof sheet runs, part numbers, run tags and start arrows, ready for the installer. Cladding is now cut correctly around sectional doors, and cladding parts are numbered for you.
- Flashing profile drawings show each flashing by its shape, ready for the folder, including standard roll-top ridges.
- New flashings are added where they apply, including aprons, purlin caps, bay opening headers and box gutters. Check they're priced before your next quote (see the checks below).
- Export drawing sets as DWG or DXF as well as PDF, from one Export button. In a DWG, each sheet opens as its own layout, matching the PDF.
- If your company has the IFC feature, IFC (BIM) exports now carry part names, properties and quantities, including bolts, anchors and turnbuckles.

---

### 07 More of your connections, ready to build

New bracket types and clearer connection choices mean fewer manual edits in the Bracket System.

![Preliminary Connections ticked and Edit Connection Types opened: the Connection Type Configuration dialog groups bases, portal and eave brackets, with a preview of each](https://help.shedmate.com.au/hs-fs/hubfs/07b-connection-types-brackets__2026-11-17.png?width=560&name=07b-connection-types-brackets__2026-11-17.png)

![Brackets, base plates and pier footings in the Bracket System model](https://help.shedmate.com.au/hs-fs/hubfs/07a-bracket-system-3d__2026-11-13.png?width=420&name=07a-bracket-system-3d__2026-11-13.png)

- New brackets for mullions, doubled-up columns, awning haunches, opening studs and lean-to rafters, alongside knee and apex bracing brackets, embedded post and plate bases, and channel fascia brackets.
- One base plate connection per grid, and punch holes stay in place when frames are trimmed. The Bracket System now opens in the Structure view.
- If you use ShedMate's preliminary connections, the Connection Types dialog now groups them with a preview of each.
- Export a Flashing Profiles DXF package from the Bracket System, and set who can view, edit or manage brackets under user permissions.

**Read more:**

- [How do I convert my shed in the Bracket System?](https://help.shedmate.com.au/knowledge/convert-your-shed-in-the-bracket-system?hsLang=en)
- [What is a bracket preset, and when should I change mine?](https://help.shedmate.com.au/knowledge/what-is-a-bracket-preset?hsLang=en)
- [Why can't I use a bolt-down base bracket on larger columns?](https://help.shedmate.com.au/knowledge/why-cant-i-use-a-bolt-down-base-bracket-on-larger-columns?hsLang=en)

---

### 08 Your brand on every sheet

Design your titleblock once, with your logo and details, and every sheet your team prints carries it.

![The Branding card in the Company profile: logos and template colours](https://help.shedmate.com.au/hs-fs/hubfs/09-company-branding-clean__2026-11-16.png?width=300&name=09-company-branding-clean__2026-11-16.png)

- We set up your titleblock with you: company details and logo, project information, paper size and revision fields.
- Your logos come from your Company profile, which now holds a document logo and a technical drawing logo.
- Add a watermark such as PRELIMINARY to preview sets, so they're never mistaken for final drawings. Watermarks are set per preset, so a preview preset can carry one while your final set doesn't.
- Print guides for folding and hole-punching.

---

### 09 New settings, more accurate quantities, and fixes you asked for

Fewer manual corrections before you quote, order and fabricate.

- New company settings let admins control adjustable purlin and girt spans and awning eave overhangs.
- Sliding panels: choose a Simple, Advanced or Manufacturer fabrication model. Simple sizes the frames for you and can add aprons automatically.
- Concrete panels can now take door and window openings, and embedded columns go at least 500 mm into the concrete.
- Shed length and width in your quotes now match the dimension type shown on your drawing.
- Fixes you told us about: roof insulation pitch with eave overhangs, awnings clashing with eave overhangs, downpipes running through columns, girts around roller doors, and wall material prompts on carports without walls.

**Good to know:** when you reopen a quote after the update, totals can move slightly up or down.

**Read more:**

- [How do I add concrete panels, with cladding above them?](https://help.shedmate.com.au/knowledge/add-concrete-panels-to-your-shed?hsLang=en)
- [How do my ShedMate databases and their versions work?](https://help.shedmate.com.au/knowledge/how-your-shedmate-databases-work?hsLang=en)

---

### Also in this update: phones, tablets and 3D

ShedMate now fits phone and tablet screens much better, with touch-friendly tables and dialogs. The 3D view cube is clearer, and showing, hiding and measuring in 3D work the same way everywhere.

---

### Rolling out first, company by company

These features are switched on one company at a time, with our help, so we can set them up around the way you work. If you'd like to be among the first, contact our support team.

### 10 Instant Build: share the build online

**Pilot: our team publishes Instant Builds with you.**

Send your builder one link to see the drawings and the 3D model together, even on site.

![Instant Build: a section on the drawing sheet shown as a cut through the 3D model](https://help.shedmate.com.au/hs-fs/hubfs/10a-instant-build-section__2026-11-16.png?width=560&name=10a-instant-build-section__2026-11-16.png)

- Publish a finished bracket job as an Instant Build: a read-only copy of the 3D model and the drawing sheets you choose.
- Builders open it from a link on a computer, tablet or phone, with no login.
- Double-click a drawing view to see the matching part of the 3D model, with section cuts and measurements.
- Each issue stays exactly as published, so later edits to the job never change what your builder already has. Older links show when a newer issue is available, and links can be set to expire.
- Your company branding and the publisher's details appear on the build.

**Good to know:** archived projects stop sharing their builds.

### 11 Quote, contract and supplier documents you design

**Switched on company by company.**

Branded quotes, contracts and supplier orders that match the way you sell, without editing Word templates.

![Pages from the ShedMate quote and contract templates: cover, price summary, contract price and a drawing sheet](https://help.shedmate.com.au/hs-fs/hubfs/11-document-templates-composition__2026-11-16.png?width=560&name=11-document-templates-composition__2026-11-16.png)

- A document editor built into ShedMate for your quotation and contract documents: text, tables, images, headers, footers, and your own fonts and styles.
- Fields fill in customer, job and pricing details for you, and each issued quote keeps an exact copy of the document it produced.
- Turn any supplier view in Instant Ordering into a branded PDF, such as a purchase order or a request for quote. Export several views as separate PDFs or as one combined PDF, and every export is saved to the job.
- Your current documents stay as they are until your company is switched over, and your existing quote revisions and documents stay accessible.

**Read more:** [Download ShedMate quote and contract templates](https://help.shedmate.com.au/knowledge/download-shedmate-quote-and-contract-templates?hsLang=en)

---

### What we're working on: a new Site Designer

We're building a new Site Designer, right inside the Shed Designer, with boundary and setback checks. It's still a work in progress, so there's no release date yet, and your current site designer stays as it is. We'll share more as it comes together.

---

### Also released since our May note

These improvements are already in ShedMate. We've gathered them here so everything since our May note is in one place.

**General Assembly (GA) plans.** GA plans, made from the Bracket System, help whoever assembles the shed work through the build, and mezzanine structure shows in GA and engineering drawings. Brackets can also be exported as DXF files for your bracket supplier. For structural purposes, rely on the Engineering Report.

**More brackets made for you.** The Bracket System makes bolted roller and sectional door mullions and headers, rod bracing brackets and punchings, and a channel fascia bracket for back-to-back portals. It also tells you when a shed has a newer version to convert.

**Smarter bridging.**

- Roof (ceiling) battens are available as a bridging profile.
- Bridging uses the right type for the purlins and girts you choose: top-hat purlins and girts get roof battens, and lipped sections get hook locks and fascia hangers.
- The designer warns you when hook locks aren't compatible with your selection.
- Company settings can set the bridging family and the bridging frames your team uses.

Before you quote battens, check your quoting database has prices for the batten profiles. A batten without a price comes through unpriced.

**Wall by wall cladding.** A company setting lets you limit editing of cladding and colours on each wall, and internal walls have their own cladding settings.

**Adjustable purlin and girt spans.** Purlin and girt spans can be adjusted for each shed, awning top spans are set separately from apex spans, and an awning purlin to main shed fascia span option gives you more control over fabrication and installation. In this update, a new company setting lets admins control these options (see 09).

**Faster pricing in Instant Quoting.** Drag and drop views into the order you work, keep the filters you use most, and pick up where you scrolled. Quote and order views have arrows and tabs, so long lists of views are easy to move through.

**A larger shed preview.** The shed preview window is larger, with a 3D view cube, dimensions on the model and tooltips, so you can check the design while you quote and order.

**Shed Presets in your order.** Company admins can drag Shed Presets into the order your sales team reaches for them. In Shed Presets, click **Reorder Presets**, drag the presets into place, then click **Confirm Preset Order**. Lists with more than 50 presets now show every preset.

**Smaller changes.**

- Skylights extend with the roof overhang.
- Sliding doors and panels no longer have to be full wall height.

**Fixes.**

- Sliding door bays no longer add extra fascia across open bays, and fly braces are no longer added at sliding door bays.
- Concrete panel area and volume are correct.
- Quote documents generate again for very large sheds.
- Wall bridging inserts correctly with inline cees on skillion and partial walls.
- Wall skylights no longer break after a roof skylight is added. If a shed has a broken wall skylight, add that wall skylight again.
- Bracket System: sectional door mullions and headers create brackets, the first conversion no longer loads forever, and rod cross-bracing lengths are worked out per brace.

---

### Before your next quote

1. **Price the new flashings.** Download the latest [flashing drawing sheet](https://help.shedmate.com.au/hubfs/Shedmate%20Guides/ShedMate-Standard-Flashing-Details.pdf?hsLang=en) (PDF) and [flashing price list](https://help.shedmate.com.au/hubfs/Shedmate%20Guides/ShedMate-Standard-Flashing-Pricing-Index.xlsx?hsLang=en) (Excel), fill in your prices and send the price list back to support@shedmate.com.au. Our Customer Success team will load it into your company's pricing database with you. Then use **Show Not Quantified** in Instant Quoting on a recent shed to check nothing is left unpriced.
2. **Set your Footing Options** (company admins): **Settings › Footing Options**. [Here's how](https://help.shedmate.com.au/knowledge/set-up-your-footing-options?hsLang=en).
3. **Re-check open quotes** once the update reaches your account. Shed length and width in quotes now follow the dimension type on your drawing, so some totals can move.

---

### We'll be in touch

Once the update is live, we'll call each company to run through the new features with your team, then book a time to catch up and make sure your account is set up to get the most from them. If you'd like to start sooner, contact our support team.

### Help and support

- Our [help centre](https://help.shedmate.com.au/knowledge?hsLang=en) has guides for many of these features, and [What is ShedMate and how does it work?](https://help.shedmate.com.au/knowledge/how-does-shedmate-work?hsLang=en) gives the full picture.
- New guides for this update: [Build a drawing set with the Sheet Manager](https://help.shedmate.com.au/knowledge/build-a-drawing-set-with-the-sheet-manager?hsLang=en), [Save and restore quote revisions](https://help.shedmate.com.au/knowledge/save-and-restore-quote-revisions?hsLang=en), [Set up your Footing Options](https://help.shedmate.com.au/knowledge/set-up-your-footing-options?hsLang=en) and [Download ShedMate quote and contract templates](https://help.shedmate.com.au/knowledge/download-shedmate-quote-and-contract-templates?hsLang=en).
- If anything doesn't look right after the update, contact our support team at support@shedmate.com.au.

Your ShedMate Team

- [Introduction to Shedmate (How does it work)](https://help.shedmate.com.au/knowledge/introduction-to-shedmate-how-does-it-work?hsLang=en#main-content)

    - [Introduction and useful information](https://help.shedmate.com.au/knowledge/introduction-to-shedmate-how-does-it-work?hsLang=en#introduction-and-useful-information)
    - [Workflow for Cold Formed x Structural Steel](https://help.shedmate.com.au/knowledge/introduction-to-shedmate-how-does-it-work?hsLang=en#workflow-for-cold-formed-x-structural-steel)
- [Frequent Asked Questions (FAQ)](https://help.shedmate.com.au/knowledge/frequent-asked-questions-faq?hsLang=en)
- [Release Notes](https://help.shedmate.com.au/knowledge/release-notes?hsLang=en#main-content)

    - [2025](https://help.shedmate.com.au/knowledge/release-notes?hsLang=en#2025)
    - [2024](https://help.shedmate.com.au/knowledge/release-notes?hsLang=en#2024)
    - [2026](https://help.shedmate.com.au/knowledge/release-notes?hsLang=en#2026)
- [Setting up Shedmate](https://help.shedmate.com.au/knowledge/setting-up-shedmate?hsLang=en#main-content)

    - [Costing Database & Pricing Calculations Setup](https://help.shedmate.com.au/knowledge/setting-up-shedmate?hsLang=en#costing-database-pricing-calculations-setup)
    - [Getting Started](https://help.shedmate.com.au/knowledge/setting-up-shedmate?hsLang=en#getting-started)
- [Setting up Shedmate Costing (COURSE)](https://help.shedmate.com.au/knowledge/setting-up-shedmate-costing-course?hsLang=en#main-content)

    - [Introduction to Cost Engineering & Shedmate](https://help.shedmate.com.au/knowledge/setting-up-shedmate-costing-course?hsLang=en#introduction-to-cost-engineering-shedmate)
    - [Starting from Scratch - A necessary learning practice](https://help.shedmate.com.au/knowledge/setting-up-shedmate-costing-course?hsLang=en#starting-from-scratch-a-necessary-learning-practice)
    - [Fast-Tracking Your Pricing Setup with Pre-Built Templates](https://help.shedmate.com.au/knowledge/setting-up-shedmate-costing-course?hsLang=en#fast-tracking-your-pricing-setup-with-pre-built-templates)
- [Integrations and API](https://help.shedmate.com.au/knowledge/integrations-and-api?hsLang=en)
- [Designing Shed Projects](https://help.shedmate.com.au/knowledge/designing-shed-projects?hsLang=en#main-content)

    - [Doors and Openings](https://help.shedmate.com.au/knowledge/designing-shed-projects?hsLang=en#doors-and-openings)
- [Quoting A Shed Project](https://help.shedmate.com.au/knowledge/quoting-a-shed-project?hsLang=en)
- [Preparing for Fabrication and Delivery](https://help.shedmate.com.au/knowledge/preparing-for-fabrication-and-delivery?hsLang=en)
- [Engineering and Design Checks](https://help.shedmate.com.au/knowledge/engineering-and-design-checks?hsLang=en)

- [All topics](https://help.shedmate.com.au/knowledge)
- [Costing course](https://help.shedmate.com.au/knowledge/setting-up-shedmate-costing-course)
- [Release notes](https://help.shedmate.com.au/knowledge/release-notes)
- [FAQ](https://help.shedmate.com.au/knowledge/frequent-asked-questions-faq)

[![Chill listening crop-3](https://help.shedmate.com.au/hs-fs/hubfs/shedmate-logo-1.png?width=75&height=26&name=shedmate-logo-1.png "Chill listening crop-3")](http://www.shedmate.com.au)

1 James St, Mount Gambier 5290  
South Australia

<https://www.facebook.com/shedmateofficial/> <https://www.instagram.com/shedmateofficial> [mailto:support@shedmate.com.au](mailto:support@shedmate.com.au)

Copyright © 2026, Shedmate